Crerar Forcemain Replacement & Sewage Pump Station Upgrades

Crerar Forcemain Replacement & Sewage Pump Station Upgrades

Project background

Crerar Sewage Pump Station and force main has been identified as in need of a capacity upgrade in order to maintain an appropriate level of service, and prevent sewer overflows.  More information about sewer over flows and the work that's being done to prevent them is located here.

Utilities Kingston will be installing upgrades to the sewage pumping station including pumps and yard piping.  A new sewer force main along the length of Crerar Boulevard will be constructed to connect the pump station to the gravity trunk sewer located on Front Road. 

Planning

Design work is currently in the 60% stage, the works will be starting with the construction of the forcemain and a portion of storm sewer along a segment in the south of Crerar Blvd and a segment on the northern part of Crescent Dr. The storm works are part of a broader project  by the City of Kingston.  

The second stage of the project consist of the upgrade of the pump station to increase capacity. This works will start after the construction of the forcemain is finalized. 

Utilities Kingston is aware of other projects currently under consideration by the City of Kingston including parks improvements, and storm drainage work.  Coordination is currently ongoing.

Below is a sketch with the approximate locations of Forcemain (green) and Storm works (light blue).

Crerar-FM-Storm.jpg

Schedule and Project Downloads

2025

RFP Design of Forcemain and Pump Station upgrades, tender and contract administration for Pump Station Upgrades. 

Awarded to EXP.

2026

Pump station and force main construction project anticipating 12 -16 weeks of construction impacts.

Contacts

For more information on this project please contact:

Laura Segura Serrano

lseguraserrano@utilitieskingston.com

Utilities Kingston
Marc Hickling
Engineering Project Coordinator
85 Lappan’s Lane
Kingston, ON K7L 4X7
Cell: 613-217-0181
Office: 613-546-1181, extension 2466
Email: mhickling@utilitieskingston.com
Utilities Kingston
Laura Segura Serrano, Ph. D (she/her)
Project Manager
85 Lappan's Lane
Kingston, ON K7L 4X7
Office: 613-546-1181, extension 2217
Email: lseguraserrano@utilitieskingston.com