In 2019, our crews installed 27 streetlights, straightened 23 poles, repaired 161 Streetlights, made 207 traffic signal related repairs, installed 4 pedestrian crossovers, replaced 118 UPS batteries at 29 intersections, repaired damage from 23 Motor Vehicle Accidents.

What's the context? 
We've provided data on our achievements in 2019. If you're looking for additional context on how much overall infrastructure we maintain, check out our overview infographics.

Featured Department: Streetlight and Traffic Signals Group 

Streetlight Progress

Highlights of streetlight work in 2019 included the following:

  • Replaced 20+ end-of-life streetlight poles in City central, east and west. Utilities Kingston conducts an annual streetlight pole inspection program, identifying poles to prioritize for replacement.
  • Installed ten new streetlights on Front Road, from Bayridge Drive to Lakeland Point Drive.
  • Replaced 20 end-of-life poles on Fortune Crescent.

Traffic Signal Progress

To support local development and road safety, we installed the following new signalized intersections:

  •       Cataraqui Woods Drive and Centennial Drive
  •       Sydenham Road and Cataraqui Woods Drive
  •       Unity Road and Highway 38
  •       Ontario and Lower Union

For pedestrian safety, we installed crossovers at the following intersections:

  •       Ontario Street and Lower Union Street
  •       Johnson Street and Macdonnell Street
  •       Sir John A. Macdonald Avenue and Norman Rogers Drive
  •       Front Road and Lakeview Road 

Crews install a new streetlight on Indian Road.
You can count on us! Crews install a new streetlight on Indian Road.
Streetlight Traffic Signal Technicians Curtis Smith (back), Murray Hodgson (right) and Nick Hodgson(front) install wiring through underground conduits for new traffic signals at Cataraqui Woods and Centennial.
Streetlight Traffic Signal Technicians Curtis Smith (back), Murray Hodgson (right) and Nick Hodgson(front) install wiring through underground conduits for new traffic signals at Cataraqui Woods and Centennial.
Crews built a new signalized intersection at Unity Road and Highway 38.
Crews built a new signalized intersection at Unity Road and Highway 38.

Response to Windstorm, Nov. 1

The extreme wind storm we experienced on Friday, Nov. 1 created widespread damage to traffic signal infrastructure across the province, including here in Kingston. Our traffic signal crews worked overnight to repair damaged intersections.

Crews replaced 45 damaged traffic signal heads at 35 intersections and aligned 25 twisted traffic signal heads at 18 intersections. We also repaired one downed streetlight pole and several minor connection issues, and seven pathway lights.